Produit Virdeeler
Firwat Dëst 241kWh Cabinet BESS Stand Out
Grad A LiFePO4 · 314 Ah
1P240S Single-String - keng parallel Ongläichgewiicht. 100% Fabréck-gescannt Manner wéi oder gläich wéi 3mV Ofwäichung pro IEC 62620.
Flësseg / Loftkühlung konfiguréierbar
Glycol cold plates for >40 Grad Ëmfeld: ± 2 Grad Zelluniformitéit, 15–20% méi laang Zyklusliewen vs Loft-gekillt a waarme Regiounen.
Alles-an-Een Modular Integréiert
Batterie + PCS + BMS + EMS + STS + Ofkillung + Feier Ënnerdréckung an engem IP55 Outdoor Gehäuse. Null op-Site Assemblée.
5-Layer Sécherheet Architektur
Zell BMS → Modul Sicherung → Rack thermesch Barrière → Cabinet Feier Ënnerdréckung → System Noutfall disconnect. All onofhängeg.
Méi wéi oder gläich wéi 89% DC Round-Trip Effizienz
IGBT-based PCS. AC-AC ≥86%. Liquid-cooled maintains 1–2% higher efficiency in >40 Grad Ëmfeld.
Cloud EMS + Remote O&M
Echt-Zäit SOC/SOH/Muecht/Temperatur Dashboards. Anomalie Alarmer. OTA Firmware Updates. API fir SCADA Integratioun.
Systemarchitektur
Bannen am Integréierte Cabinet BESS
Sechs Ënnersystemer, eent Gebitt. Keen externe Matching erfuerderlech.
125KW Bi-Direktional PCS
Gitter-gebonnen + aus-Rastermodi. STS Manner wéi oder gläich wéi 20ms Transfer. 380V/400V/415V 3-Phas, 50/60Hz.
Energie Management System (EMS)
Peak raséieren, TOU Arbitrage, Solar Selbstverbrauch-, Demande Äntwert. SCADA API.
Batterie Management System (BMS)
Zell-Niveau V/I/T Iwwerwaachung. Aktiv Balance iwwer 240S String. SOC/SOH ± 2% Genauegkeet.
Static Transfer Switch (STS)
Sub-20ms Gitter↔off-Gitter. UPS -grad kritesch Belaaschtungskontinuitéit.
Thermesch Management & Ofkillung
Loft: IP55 gezwongen Belëftung. Flësseg: Glykol kal Placke, ± 2 Grad Uniformitéit.
Feier Ënnerdréckung System
Rauch / Gas detektéieren → Aerosol séier → Perfluorohexanone Iwwerschwemmung. Null Rescht.
241kWh Cabinet BESS Spezifizéierung
BatterieParameter
| Modell | CBS 240 | |
| Bewäert Spannung | 768V | |
| Bewäert Kapazitéit | 314 ahjo | |
| Energie | 241 kWh | |
| Betribsspannung Range | 624-864V | |
| Serie a Parallelverbindung | 1P240S | |
System Parameter
| Gitter Standard | 3L+N+PE |
| Bewäert Kraaft | 125 kW |
| Grid Volt Range | 380V (-15% bis +10%) |
| Bewäert aktuell | 190A |
| Maximal Konversioun Effizienz | 97% |
| Iwwer-Laden Fäegkeet | 110% 1 min |
| Bewäert Frequenz | 50 Hz |
| Gitter Frequenzbereich | 50 Hz ± 2,5 Hz |
| Grid Total Distortion Rate (THDi) | Manner wéi oder gläich wéi 3% bei voller Laascht |
| Dräi-Phase Unbalance Degree | 100% |
| Power Faktor | -1~+1 justierbar |
Allgemeng Parameter
| Kühlsystem | Flëssegkühlen (Loftkühlen optional) |
| Feierläscher System | Perfluorhexanon + Aerosol Dual-stuf |
| Operatioun Temperatur | -20-50 Grad |
| Kaméidi | Manner wéi oder gläich wéi 60dB |
| IP Grad | IP54 Eng |
| Gréisst (W × D × H) | 1195 × 1400 × 2140 mm (47.1 × 55.1 × 84.3 Zoll) |
| Gewiicht | Manner wéi oder gläich wéi 2,8 Tonnen |
Notiz:Standard Konditiounen. Ofkillung, Inverter, Zertifizéierungen konfiguréierbar pro Projet.Luet den ganzen Dateblatt (PDF) erof
De Cabinet BESS sinn offiziell als kompatibel opgezielt vu verschiddene weltwäit unerkannten Inverter Hiersteller. All Produkt huet rigoréis Tester a Validatioun ënnerholl fir eng nahtlos Kommunikatioun, zouverléisseg Operatioun a voller Kompatibilitéit iwwer verschidden Inverterplattformen ze garantéieren.












Zertifizéierungen

241kWh Cabinet BESS - Technesch FAQ
Q: Firwat benotzt d'241kWh 1P240S amplaz parallele Strings, a wat ass den realen-welt Impakt?
A: 1P240S setzt 240 Zellen a Serie mat null parallele Saiten. Dëst eliminéiert inter-String aktuell Ongläichgewiicht - eng gemeinsam Grondursaach vu virzäitegen Kapazitéitfade bei multi-parallellen Designen. Mat nëmmen enger String geréiert de BMS e méi einfachen, méi prévisibel Charge / Entladungsprofil. Den Handel -Off: all 314Ah Zell muss méi enk erakommende Screening passéieren (Manner wéi oder gläich wéi 3mV, Manner wéi oder gläich wéi 5mΩ) fir schwaach -Linkdegradatioun ze vermeiden. An der Praxis heescht dat méi konsequent Zyklus Liewen iwwer déi voll 241,15 kWh - Benotzer gesinn manner SOH Divergenz tëscht Joer 3 an 10 am Verglach mat 2P oder 4P Architekturen mat ähnlechen Gesamtkapazitéit.
Q: Wann eng Zell an thermesch Laf an dësem Cabinet geet, wat verhënnert et fir niewendlech Moduler z'erreechen?
A: Fënnef Schichten brennen sequentiell: Zell BMS markéiert d'Anomalie an<500ms and isolates it; module fuses cut fault current before propagation; rack-level ceramic barriers block heat transfer physically; if temperature or gas levels still rise, the cabinet's perfluorohexanone + aerosol system floods the compartment automatically (no residue, no electronic damage); and finally the STS disconnects the entire cabinet from the grid in ≤20ms. Because this is LiFePO4 - not NCM or NCA - the failing cell does not release oxygen, which is the main propagation driver in ternary chemistries. No layer depends on another to function. For a deeper look at how UL testing validates these safety layers, see our guide on BESS UL Zertifizéierung.
Q: 241kWh nominell, awer wéi vill AC Energie kënnt eigentlech pro voll Zyklus eraus?
A: At default EMS settings (5% bottom SOC reserve, 2% top), usable DC capacity is ~224 kWh per cycle. Multiply by ≥86% AC-AC round-trip efficiency (at 25°C, 0.5C) and you get roughly 193–207 kWh AC delivered to load - the range depends on ambient temperature and C-rate. In hot climates (>40 Grad), déi flësseg-gekillte Variant liwwert 1-2% méi héich Effizienz wéi Loft-gekillt, well méi streng thermesch Kontroll intern Resistenz reduzéiert. Wann Äre Projet maximal Ausgang erfuerdert, sinn d'EMS SOC Reserven justierbar - awer méi schmuel Reserven handelen d'Längegkeet fir kuerz -Kapazitéit.
Q: Dëse Cabinet weegt Manner wéi oder gläich wéi 2,8 Tonnen - wat brauch de Site fir et z'ënnerstëtzen?
A: Fondatioun: Niveau Beton Pad oder Stahlrahmen bewäert Méi wéi oder gläich wéi 4.000 kg. D'Eenheet (1400 × 1300 × 2387 mm) brauch 800 mm Spillraum virun fir Service Zougang an 300 mm op aner Säiten fir Belëftung. E Standard Méi wéi oder gläich wéi 3,5t Gabellift kann et - keng Kran positionéieren. Elektresch: 3-Phas 380/400/415V AC Verbindung, lokal-Code Buedem, Ethernet oder RS485 Kabel fir EMS. Polinovel Schëffer Dimensioune Fundamenter Zeechnungen a Kabel Routing Guiden mat all Bestellung, a bitt gratis Remote commissioning Ënnerstëtzung via Video Uruff.
Q: Wann ech 4-8 vun dësen 241kWh Schränke parallel parallele maachen, wéi verhënnert d'EMS ongläich Alterung?
A: The centralized EMS runs a weighted SOC balancing algorithm each control cycle (~100ms): cabinets with higher SOC discharge proportionally more, lower-SOC units receive more charge current. This keeps all cabinets within a tight SOC band and prevents any single unit from cycling disproportionately - which is the main cause of uneven aging in parallel BESS systems. Each cabinet retains independent BMS and PCS, so if one trips on a fault, the others absorb its load seamlessly. Communication: Modbus-TCP over Ethernet, 1-second polling. For systems >2 MWh, recommandéiert Polinovelcontainerized BESSfir besser $ / kWh op Skala.
Q: Kann d'125KW PCS d'Gitter-gebonne Peak Raséiere während dem Dag an aus -Gitter Backup an der Nuecht an der selwechter Installatioun handhaben?
A: Jo - den EMS ënnerstëtzt Zäit-geplangte Moduswiessel. Beispill: Grid-TOU Arbitrage 6AM–10PM, automatesch Off-Grid Backup 10PM–6AM. De STS handhabt all Iwwergang a Manner wéi oder gläich wéi 20ms. Fir Astellunge wou e puer Laaschte musse Raster-gebonne sinn, während anerer gläichzäiteg aus dem-Gitter lafen (opgedeelt-Bus), ass zousätzlech Schalter iwwer d'Standardkonfiguratioun erfuerderlech.Kontakt Polinovel Engineeringfir Split-Busprojet Ëmfang a Präisser.
Technesch Abléck fir C&I Energie Stockage

Wéi vill kascht e BESS tatsächlech am Joer 2025?
Schlësselfäerdeg Präisser, verstoppte Käschten, a ROI Methodik fir Cabinet & Container Projeten.

Grouss Skala Energiespäicherung - Wat ass geännert?
Dauer Trade-Offs, Fabrikatiounsbeschränkungen, a firwat EMS Software méi wichteg ass wéi d'Leit mengen.

Wann Skala vum Cabinet zu Container BESS
Kapazitéitsschwellen, Käschtebriechpunkten a Formfaktor-Entscheedungskader.
Hot Tags: 125kw 241kwh Outdoor Cabinet Energiespäichersystem, China 125kw 241kwh Outdoor Cabinet Energiespäichersystem Produzenten, Fournisseuren, Fabréck












